Tender news

Expression of interest (EOI) – ISBL MODIFICATION FOR EVN PROJECT

1. General Information

2. Experience and Technical Capabilities

3. Project Management and Resources

4. Quality Assurance and Quality Control (QA/QC) for Engineering work

5. HSSE Plan

6. Detail Engineering, Procurement and Construction Plan

7. Warranty

8. Brief scope of work

EPC, installation, testing, Pre-commissioning ,Commissioning, Training

Package 1 – Electrical Modifications

+Addition and modification of 33kV GIS cabinets

+  Power Management System (PMS) upgrades including Fast Load Shedding (FLS), Under Frequency Load Shedding (UFLS), synchronization, load sharing, islanding, and SCADA connection to EVN

+ STG/GTG system modifications for parallel operation with EVN grid.
+ Data provision and coordination with PSC/EVN for parallel operation approval.

  Package 2 – Process Modifications