Expression of interest (EOI)PROVIDING POSITIVE WATER PROOFING AND SLANTED FRAME STRUCTURE IMPROVEMENT FOR FGD

1. General Scope of Work

PROVIDING POSITIVE WATER PROOFING AND SLANTED FRAME STRUCTURE IMPROVEMENT FOR FUEL GAS DESULPHURIZATION (FGD) PROJECT
      OBJECTIVEThis document describes the Scope of work of the Contractor (the Works) and requirement to perform Engineering, Procurement, Construction, Pre-commissioning, Commissioning works for providing a positive waterproofing improvement inside connection point between flue gas duct and FGD absorber and to provide upgraded anti-foaming device by using slanted sheets and FRP structure support inside the absorber.
SCOPEEngineering, procurement, fabrication, installation, testing and commissioning of Positive Waterproofing improvement works for leakage mitigation between the FGD absorber and flue gas duct.Engineering, procurement, fabrication and installation of upgraded Slanted Frame Structure (Anti-Foaming Device) and all associated supports, connections and accessories.Removal of existing damaged components and execution of all required modification, repair and reinstatement works.Provision of all materials, equipment, temporary facilities, manpower, supervision and consumables necessary for complete project execution.Performance of inspection, testing, pre-commissioning, commissioning and performance verification activities to demonstrate compliance with project requirements.All works shall be carried out in accordance with NSRP specifications, applicable codes and standards, and NSRP HSSE requirements.  

2. General Information

3. Experience and Technical Capabilities

4. Project Management and Resources

5. Quality Assurance and Quality Control (QA/QC) for Engineering work

6. HSSE Plan

7. Detail Engineering, Procurement and Construction Plan

8. Warranty