Date: 18 June 26, Rev. 0
Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for the procurement of EPCC for “Upgrade RFCC Catalyst feeders’ system” package.
If your company is interested in those procurement packages, please fill in and complete the questionnaire below then send email to giang.vt1@NSRP.COM.VN
Subject: “Respond for Questionnaire – EPCC for “Upgrade RFCC Catalyst feeders’ system” by 17:00 PM 25 June 2026 at the latest.
1. Project introduction
· RFCC Catalyst feeders (022-FD-101 A/B, 022-FD-102, 022-FD-103) are critical equipment to maintain sufficient catalyst make-up to Regenerator section of RFCC unit for:
Maintaining proper equilibrium catalyst activity so that target conversion is achieved
Maximizing propylene yield when market conditions are favorable.
Controlling metal on E-cat
These feeders operate in batches. The exact amount of catalyst will be weighed and transferred to Regenerator section in each batch.
· The weighing computers were found malfunctioned and need to be replaced but all existing weighing computers (CPU) are obsolete and cannot be ordered because the current version is not available anymore.
· In addition, catalyst make-up amount to RFCC unit is higher than design value due to iron issue leading to high frequency of feeder operations and more failure as well.
· The current weighing computer is not available on the market and Vendor doesn’t supply it further. As per Vendor recommendation, it’s proposed to upgrade the existing Control panel including weighing computers by new models of Weighing computers (integrated HMI)
· NSRP is using Allen-Bradley PLC for almost Package Unit control systems (PUCS), Local control panel, Bidder can propose PLC rack solutions for upgrading existing Catalyst feeder Control panels.
2. General Scope of Work
· The Contractor shall provide all necessary parts for new Control panels of 04 Catalyst feeders (New weighing computers or PLC racks with accessories…) and service to complete upgrade existing 04 Catalyst feeders’ control panel to be new Control panels. The Service includes:
a. Provide detailed engineering design & software for new control panels to match existing design, operation and communication of existing catalyst feeders.
b. Supply all necessary related parts, bulk materials, accessories, commissioning and initial spare part for upgrading existing system.
c. Programming based on existing operating sequences, Installation, Setting, Configuration, FAT, SAT.
d. I/O Test, Function test, Communication with DCS test, Commissioning and Performance check.
e. Co-ordinate with other parties such as DCS, Instrument, Operation, HSSE for testing new system.
f. Training for Operation and Maintenance
g. Fix any issues occurring after new system put in service in 12 months
· Contractor shall support troubleshooting of new Control panel upon request from NSRP’s engineers.
· Contractor shall ensure activities to be carried out under the supervision of experienced OEM Field service engineer of the Contractor either in the installed locations of system or in Contractor’s facilities and workshop.
3. General / key requirements for Contractor capability (questionnaires)
(1) Does your company have valid business registration and legal eligibility to perform the Scope of Work (SOW) in Viet Nam?
Please provide a valid Business Registration Certificate (company name, address, registration number) and confirm that your licensed business scope covers engineering, procurement, construction, pre-commissioning and commissioning activities related to refinery and petrochemical projects. Indicate years of operation in the oil & gas industry and details of local entity (if foreign contractor).
Evidence to attach: Business Registration (PDF), relevant licenses/permits, company profile.
(2) Does your company have proven experience and capability to execute engineering, procurement, construction, installation, pre-commissioning and commissioning works for Catalyst feeders’ system, or Package Unit control system for Catalyst
feeders/Metering feeders in refinery, petrochemical, power generation, or heavy industrial facilities?
The Contractor shall demonstrate at least three (03) similar projects completed within the last ten (10) years. Where any part of the scope is performed by subcontractor(s), the Contractor shall provide valid subcontract agreements, OEM support agreements, MOUs, or equivalent documents demonstrating the subcontractor’s commitment and capability for this project.
Evidence to attach: Similar contracts, completion certificates, project references, OEM authorization/support letters (if applicable), and subcontract agreements.
(3) Does your company hold valid ISO certifications and management systems applicable to this project?
Confirm current certifications: ISO 9001 – Quality Management System; ISO 14001 – Environmental Management System; ISO 45001 – Occupational Health and Safety Management System.
Evidence to attach: ISO certificates, relevant contracts, sample HSE execution plan from previous project.
(4) Does your engineer have certificates to do system integrated for Weighing computer/PLC to Honeywell Experion DCS product?
Confirm Field service engineer can do setting, handling communication, commissioning, of this project to existing DCS Experion C300 during execution phase
Evidence to attach: Provide evidence
(5) Does your company able to provide the CO (Certificate of Origin), CQ (Certificate of Quality), CoC (Certificate of Conformity), and Warranty Certificate for goods supplied by the OEM.
Evidence to attach: Commitment letter must be included in submission.
https://nsrp.vn/wp-content/uploads/2026/06/Survey-Quesionnaire-Upgrade-Feeder.docx