Tender news

BOILERS PROJECT SURVEY QUESTIONNAIRE FOR PROVISION OF EPC OF INSTALLING NEW STEAM SAMPLING SKIDS FOR STEAM BOILERS PROJECT

Date: 21/09/2026

Subject: EPC of Installing New Steam Sampling Skids for Steam Boilers Project

PURPOSE:

To determine the long list of bidders for bidding package “EPC of Installing New Steam Sampling Skids for Steam Boilers Project” in accordance with NSRP Procurement Procedure, the Pre-Q Questionnaire are developed as below.

“Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for the procurement of EPCC of Installing New Steam Sampling Skids for Steam Boilers Project (the Services) to select a suitable Contractor for provision of those Services for NSRP. The tentative date for starting the Services will be in December 2026

If your company is interested in this procurement package, please respond to all the questions in the questionnaire in following part and send through email thach.cd@nsrp.com.vn. The email must reach the email address above no later than 25th Sep 2026. The response submitted via email must be clearly marked with the following title:

“EPCC of Installing New Steam Sampling Skids for Steam Boilers Project”

Should you have any question, please contact us at thach.cd@nsrp.com.vn for further information.

For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP. Neither shall your satisfaction with all the minimum requirements mentioned above nor your response to this notice create any promise or guarantee by NSRP that you will be invited to participate in the above-mentioned procurement process.

Brief scope of work

Current design:

In a refinery, steam is distributed through High-Pressure Steam (HPS), Medium-Pressure Steam (MPS), and Low-Pressure Steam (LPS) networks to serve various process and utility applications. These include providing heat to heat exchangers and reboilers, driving steam turbines and compressors, operating steam ejectors, performing steam stripping and purging, supplying steam tracing, and generating steam for other process requirements.

Problem statement:

In actual operating, the NSRP refinery steam system currently lacks steam sampling skids, and some existing skids are non-standard at some locations. Consequently, steam quality cannot be controlled/ monitored properly. Meanwhile, steam purity is very important parameter for monitoring performance of upstream and downstream operating performance.

Scope of work:

The Contractor shall provide full Engineering, Procurement, Construction/ Installation and Commissioning assistant (EPC) for the Services in accordance with this Contract to the satisfaction of NSRP.

The scope of work shall include 2 main components:

The general Scope of Work includes, but is not limited to:

Details in SOW will be sent later after receiving your Expression of interest (EOI).

1. General Information

2. Experience and Technical Capabilities

3. Project Management and Resources

4. Quality Assurance and Quality Control (QA/QC)

5. HSSE Plan

6. Warranty:

Evaluation Criteria

Bidders must answer “Yes” to all questions in the Pre-Qualification Questionnaire and provide the required supporting documentation.

Any response of “No”, or failure to provide adequate supporting documentation, may result in the bidder being disqualified from the pre-qualification process.