Notice of procurement plan for provision engineering & designing shelter service for the open yard of warehouse

NOTICE OF PROCUREMENT PLAN

FOR PROVISION ENGINEERING & DESIGNING Shelter SERVICE for the Open Yard of Warehouse

Date: 01st July, 2019.

Subject:  PROVISION ENGINEERING & DESIGNING Shelter SERVICE for the Open Yard of Warehouse

Ref. No.: 101/2019/NSRP-PS

Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for procurement of a package for “Provision engineering & Shelter service for the Open Yard of Warehouse” in order to select a suitable contractor for provision the Engineering and Designing Shelter Service for the Open yard area in Warehouse Section. The tentative date of commencement of the provision of this services will be around within Aug, 2019

NSRP plans to start the above-mentioned procurement process very soon. Please fill in and complete the questionnaire as below and submitted via email to hoan.hk@nsrp.com.vn and copying phuong.ntt1@nsrp.com.vn and hoa.lh@nsrp.com.vn state clearly “Provision engineering& Shelter service for the Open Yard of Warehouse” and send back to us by following address by 5:00 PM –8h July, 2019.

Should you have any question, please contact us at hoan.hk@nsrp.com.vn and copying hoa.lh@nsrp.com.vn for further information.

For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP. Neither shall your satisfaction of all the minimum requirements mentioned above nor your response to this notice creates any promise or guarantee by NSRP that you will be invited to participate in the above mentioned procurement process.

  1. Please provide the following information of your company.

Name:

Address:

Tax Code:

Contact person:

Contact details:

  1. Brief description of your company’s qualifications and experience in providing services
  2. Questionnaire:

Please answer the questions below:

Survey questionnaire

QUESTION 1: Do you have a clear intention in provision of engineering and designing service for materials storage shelter with related service?

  1. Yes
  2. No

QUESTION 2: Can you provide business registration certificate of your company? If yes, please provide your company profile (company name, address)

  1. Yes
  2. No

QUESTION 3: Does your company have more than 3 years’ experiences in providing design/engineering work especially for shelter installation & Electrical Solar system?

  1. Yes
  2. No

If yes, please provide the list of similar contracts and at least 2 full copy of executed contracts/ purchase orders.

QUESTION 4: Can you provide the proposed engineering design drawings (2D/3D), detailing symbols and legends drawings, and statutory submission for the new shelter. The design shall be verified by 3rd party (the third party is ISO 9001 certified or equivalent and have valid license by authorities) 

  1. Yes
  2. No

If yes, please provide the proposed engineering design drawings (2D/3D)

QUESTION 5: Does your company have at least 02 architects & 01 electrical engineer have more than 05 years experiences on designing buildings, shelters and the related electrical works?

  1. Yes
  2. No

If yes, please provide the list of your architects, engineers, their qualifications & some projects they have involved.

General Information & background

  1. Provision of engineering design drawings (2D/3D), detailing symbols and legends drawings, and statutory submission for the new shelter. Verified by 3rd party certified ISO 9001 or equivalent:
No. Item Data
1-a Fixed shelter (all new) 5.000 sqm (m2 ), minimum height 3m
1 –b Fixed shelter (repair current shelter) 750 m2
2-a Movable roof/shelter (steel structure) 3000 sqm (m2 ), minimum height 6.5m

To support for heavy & big goods (more than 8 tons) movement in/out of shelter

2-b Movable roof/shelter (container)
2-c Waste storage & sorting shelter 2,000 m2

Waste storage standard

collection slot

3 Solar power system Capacity 50 – 100 Kwh
4 Access control system Only Tie-In point is required
5 CCTV system Only Tie-In point is required

 

  1. Provide details materials list (specification, quantity, certifications required, etc.,) and provide total estimated cost (break down in detail as much as possible)