Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for procurement of Chemical cleaning AFC and Chemical Decontamination Services.
If your company is interested in those procurement packages, please fill in and the complete questionnaire below then send email to hiep.lt@nsrp.com.vn “Response for Questionnaire “Supply of Chemical cleaning AFC and Chemical Decontamination Services” by 13 Oct 2026 at the latest. For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP.
Please answer the questions below:
Part 1. Survey questionnaire
Questions for Scope #1: Chemical cleaning for AFCs (inside system)
QUESTION 1: Does your company have experience in supply “industrial chemical cleaning for Air fan cooler, heat exchangers, Cooler” in the last 05 years?
If yes, please provide evidence (POs/ Contracts)
QUESTION 2: Has your company previously performed chemical cleaning of at least three air coolers, heat exchangers, or cooler systems?
1. Yes
2. No
If yes, please provide evidence (POs/ Contracts)
QUESTION 3: Does your company have detailed method statement for conducting chemical cleaning for AFC or heat exchanger or cooler system?
1. Yes
2. No
If yes, please provide evidence (typical method statement)
QUESTION 4: Does your company agree to comply with and commit to fulfilling all requirements specified hereby:
PERFORMANCE GUARANTEE FOR Chemical Cleaning for Air Fan Coolers (AFC)
The Contractor shall guarantee that:
+ No Mechanical Damage
No mechanical damage shall occur to AFC tubes, headers, fins, or associated equipment during chemical cleaning.
+ No Corrosion Damage
No corrosion or chemical-induced damage shall occur within one (1) year after TA2 due to the cleaning chemicals or cleaning process.
+ Cleaning Performance
Fouling deposits shall be effectively removed, and cleanliness shall be verified by visual inspection and accepted by NSRP following MD-04-AT-TAR-PD-018: Cleanliness Inspection Procedure.
+ Failure of Guarantee
If the Contractor fails to achieve the guaranteed performance, compensation shall be applied in accordance with the Contract including repair cost, replacement cost, manual cleaning cost, or applicable penalties (Max 8% contract value).
The Contractor shall provide:
1. Yes
2. No
If yes, please provide a signed confirmation letter.
Questions for Scope #2: Chemical decontamination for two equipment loops
QUESTION 1: Does your company hold a valid business license and all required permits/authorizations to perform chemical decontamination services in Vietnam?
If yes, please provide a copy of the Business Registration Certificate and relevant licenses/permits.
QUESTION 2: Does your company have experience in performing chemical decontamination for refinery or petrochemical facilities within the last 5 years?
1. Yes
2. No
If yes, please provide evidence (POs / Contracts / Completion Certificates).
QUESTION 3: Has your company successfully executed chemical decontamination for process vessels, columns, reactors, or piping systems?
If yes, please provide project references.
QUESTION 4: Does your company have a detailed methodology/procedure for chemical decontamination, including chemical injections, circulation, monitoring, neutralization, and waste disposal?
If yes, please provide a typical method statement.
QUESTION 5: Can your company provide chemical TDS/SDS and confirm compatibility with the equipment metallurgy and process systems?
If yes, please provide sample TDS/SDS documents.
QUESTION 6: Can your company commit to meeting NSRP acceptance criteria (LEL, H₂S, VOC, pH, Iron Content, Visual Cleanliness, and System Readiness) as detail limit and criteria in Scope #2 Chemical decontamination?
Detail limit and criteria:
The Vendor shall propose and guarantee measurable acceptance criteria for the chemical cleaning and decontamination works. As a minimum, the following criteria shall be achieved unless otherwise agreed by NSRP.

If yes, please provide a signed commitment letter.
Appendix 1
Scope #1: Chemical cleaning for 12 AFC loops
The Contractor shall perform Chemical Cleaning for Air Fan Cooler (AFC) following twelve (12) AFC systems and associated upstream/downstream piping systems to remove internal fouling deposits (restore thermal performance, reduce pressure drop, improve flow distribution, and ensure equipment integrity and reliability)

The Contractor’s scope shall include but not be limited to (some key points)
Scope #2: Chemical decontamination for two equipment loops
The chemical cleaning and decontamination services shall be applicable to the RFCC Absorber Section and Amine Regeneration Section as listed below:
| No. | Loop / Equipment Name and Description | Service / Expected Contaminants | Equipment Dimension / No. of Trays | Estimated Volume |
| 1 | RFCC Absorber Section: 023-C-001 023-C-002 023-C-003 | Gasoline, LPG, High H₂S content, FeS, sludge / coke deposits | 023-C-001: ID 3,800 mm x TT 26,420 mm / 31 trays 023-C-002: ID 5,200 mm x TT 32,120 mm / 36 trays 023-C-003: ID 2,300 mm x TT 17,520 mm / 20 trays 023-V-003: ID 5,700 mm x 19,000 mm 023-V-004: ID 3,200 mm x10,300 mm | 023-C-001: 255 m³ 023-C-002: 580 m³ 023-C-003: 62 m³ 023-V-004: 70 m³ |
| 2 | Amine Regeneration Section: 023-C-201, 023-V-201 and associated equipment | Rich Amine, Hydrocarbon, High H₂S content, FeS, sludge / deposits | 023-C-201: ID 900 / 1,400 / 2,700 mm x TT 3,100 / 13,740 / 6,360 mm / 24 trays 023-V-202: ID 800 mm x 2,250 mm 023-E-202: ID 1,500 mm x 1,850 mm 023-E-203: ID 800 mm x 3,500 mm | 023-C-201: 50 m³ 023-V-202: 1.1 m³ 023-E-202: 2.8 m³ 023-E-203: 1.5 m³ |
The Vendor shall provide all required manpower, chemicals, equipment, tools, consumables, supervision, engineering support, technical expertise, execution resources, monitoring, testing, and reporting necessary to safely and effectively perform the chemical cleaning and decontamination works.
Schedule: In TA2, During Shutdown phase, The Vendor shall ensure completion within the approved RFCC shutdown window without causing delay to the overall shutdown schedule