Introduction
Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is identifying suitable suppliers for the Hydrogen Manufacturing Catalyst suite for Unit 070-HMU. This unit utilizes Foster Wheeler Terrace Wall SMR technology and Pre-reformer technology to produce 145 KTA of high-purity hydrogen.
Operating Context for Bidders: The catalyst suite must be designed to handle three distinct feed cases and maintain performance for a minimum of 48 months:
– Case 1: CCR Tail Gas + RFG (30–45 wt%) + Balance LPG.
– Case 2: 100 mol% LPG (98% Butane + 2% Butylene + 100 ppmw Butadiene).
– Case 3 (Future): CCR Tail Gas + RFG (30–45 wt%) + Balance LNG.
If your company is interested in this procurement package, please fill in and the complete questionnaire below then send email to hieu.nd@nsrp.com.vn “Response to Questionnaire – Supplying 070-HMU Catalyst” by 21-July-2026 at the latest. For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP.
PART 1: BUSINESS AND COMMERCIAL STANDING
QUESTION 1:
Does your company have the required business licenses and/or authorized manufacturer letters to supply HMU SMR Catalyst in Vietnam?
Yes [ ] / No [ ]
If Yes, please provide notarized copies.
QUESTION 2:
Can your company supply the full quantity required for the HMU Catalyst suite within NSRP’s required delivery schedule?
Yes [ ] / No [ ]
If No, please provide the standard lead time from PO to EXW.
PART 2: EXPERIENCE AND REFERENCES
QUESTION 3:
Does your company have experience supplying the full suite of catalysts (HDS, ZnO, DC, Pre-Reformer, SMR, HTS) for Hydrogen Manufacturing Units being compatible with above Feed Cases?
Yes [ ] / No [ ]
QUESTION 4:
Do you have experience of the provision of catalysts for Hydrogen Manufacturing Units involving Terrace Wall SMR technology?
Yes [ ] / No [ ]
If Yes, provide a reference list of at least three (3) projects executed within the last five (5) years involving Terrace Wall SMR technology.
Please include Client and Location/Country, Capacity/Feed, and Startup Year.
QUESTION 5:
Provide at least two (2) references where your catalyst suite has successfully achieved a continuous run-length of 48 months or more while processing LPG feed.
Yes [ ] / No [ ]
If Yes, provide supporting evidence (Performance Test Run reports or Client Testimonials).
PART 3: TECHNICAL ROBUSTNESS & FEEDSTOCK FLEXIBILITY
QUESTION 6:
(HDS & Olefins): Case 2 contains 100 ppmw Butadiene and 2 mol% Butylene. Can your HDS (R-101) catalyst saturate these olefins without premature coking or pressure drop (\Delta P) buildup over 48 months?
Yes [ ] / No [ ]
Please briefly describe your catalyst’s olefin management strategy.
QUESTION 7 (Chlorides):
Given the use of CCR Tail Gas, can your purification system (R-101/R-102) guarantee chloride removal to <0.1 ppmv to protect the downstream Pre-reformer?
Yes [ ] / No [ ]
QUESTION 8 (Pre-Reformer Steaming):
How long does your Pre-reforming catalyst withstand a pure steaming operation (without H_2 circulation) at operating temperature without permanent loss of activity or structural disintegration?
Yes [ provide time duration] / No [ ]
QUESTION 9 (SMR Coking Resistance):
For the FW Terrace Wall Reformer processing 70–100% LPG, do you provide a specialized Alkali-promoted (Potash) catalyst or a specific layered loading strategy to prevent carbon formation in the high-heat flux zones?
Yes [ ] / No [ ]
QUESTION 10 (HTS Hydrocarbon Suppression):
Does your HTS catalyst maintain selectivity and suppress Fischer-Tropsch (FT) byproduct formation during low Steam/Carbon operation or when processing high-CO syngas derived from LPG?
Yes [please advise the lowest S/C ratio in Pre-Reformer and Reformer] / No [ ]
PART 4: TECHNICAL SUPPORT AND WARRANTY
QUESTION 11:
Does your company provide a comprehensive technical support package, including:
– Kinetic modeling for the transition from LPG to LNG (Case 3)? [ ] Yes / [ ] No
– On-site loading supervision (Unidense/Spirajet … compatible)? [ ] Yes / [ ] No
– A performance warranty covering the 48-month life? [ ] Yes / [ ] No
QUESTION 12:
Describe your technical response procedure for a “Sulfur/Chlorides Slip” or “Reformer Hot-Band” emergency. (Maximum 200 words).
PART 5: DECLARATION
I, the undersigned, represent that the information provided above is true and
accurate.
Authorized Signature: ___________________________
Company Stamp: ________________________________
Date: __________________________________________