Tin tức đấu thầu

SURVEY QUESTIONNAIRE FOR PROVISION OF EPCC OF FIRE DETECTION SYSTEM FOR STG PROJECT

Date: 26/05/2026

Subject: EPCC of Fire Detection System for STG Project

PURPOSE:

To determine the long list of bidders for bidding package “EPCC of Fire Detection System for STG Projectin accordance with NSRP Procurement Procedure, the Pre-Q Questionnaire are developed as below.

“Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for the procurement of EPCC of Fire Detection System for STG Project (the Services) in order to select a suitable Contractor for provision of those Services for NSRP. The tentative dates of starting the Services will be in June 2026

If your company is interested in this procurement package, please respond to all the questions in the questionnaire in following part and send through email thach.cd@nsrp.com.vn. The email must reach the email address above no later than 01st June 2026. The response submitted via email must be clearly marked with the following title:

“EPCC of Fire Detection System for STG Project”

Should you have any question, please contact us at thach.cd@nsrp.com.vn for further information.

For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP. Neither shall your satisfaction with all the minimum requirements mentioned above nor your response to this notice create any promise or guarantee by NSRP that you will be invited to participate in the above-mentioned procurement process.

Brief scope of work

Nghi Son Refinery & Petrochemical LLC (NSRP) plans to implement a Fire Detection System (FDS) for five (05) Steam Turbine Generator (STG) enclosures (~41.4 MW each). The STGs operate in high‑temperature, enclosed environments with combustible lube/control oil systems. The objective is early fire detection inside STG enclosures and alarm signal integration to the existing Fire & Gas System (FGS).

The Contractor shall be fully responsible for:

Exclusions:

Detail in SOW will be sent later after receiving your Expression of interest ( EOI).

1. General Information

2. Experience and Technical Capabilities

3. Project Management and Resources

4. Quality Assurance and Quality Control (QA/QC)

5. HSSE Plan

6. Warranty:

Evaluation Criteria

Bidders must answer “Yes” to all questions in the Pre-Qualification Questionnaire and provide the required supporting documentation.
Any response of “No”, or failure to provide adequate supporting documentation, may result in the bidder being disqualified from the pre-qualification process.