Tin tức đấu thầu
Date: 22/06/2026
Subject: Project Management Consultancy Services for Engineering, Procurement, Pre-commissioning, Commissioning and Performance Test of NSRP Administration Office Building 2 Project
PURPOSE:
To determine the long list of bidders for bidding package “Project Management Consultancy Services for Engineering, Procurement, Pre-commissioning, Commissioning and Performance Test of NSRP Administration Office Building 2 Project” in accordance with NSRP Procurement Procedure, the Pre-Q Questionnaire are developed as below.
“Nghi Son Refinery & Petrochemical Limited Liability Company (NSRP) is planning for the procurement of Project Management Consultancy Services for Engineering, Procurement, Pre-commissioning, Commissioning and Performance Test of NSRP Administration Office Building 2 Project (the Services) in order to select a suitable Contractor for provision of those Services for NSRP. The tentative dates of starting the Services will be in 2026
If your company is interested in this procurement package, please respond to all the questions in the questionnaire in following part and send through email thach.cd@nsrp.com.vn. The email must reach the email address above no later than 29th June 2026. The response submitted via email must be clearly marked with the following title:
“Project Management Consultancy Services for Engineering, Procurement, Pre-commissioning, Commissioning and Performance Test of NSRP Administration Office Building 2 Project”
Should you have any question, please contact us at thach.cd@nsrp.com.vn for further information.
For the avoidance of doubt, this notice does not constitute any contractual offer, binding promise or guarantee of business by NSRP. Neither shall your satisfaction with all the minimum requirements mentioned above nor your response to this notice create any promise or guarantee by NSRP that you will be invited to participate in the above-mentioned procurement process.
1. General Information
2. General information about EPC Project
The ADMINISTRATION OFFICE BUILDING 2 (AOB-2) shall consist of main facilities is divided as below:
[1] Administration Office Building 2: Located near the existing Maintenance Office Building within the NSRP site.
Functional areas include office spaces, storage, meeting/training rooms, manager rooms, break rooms, toilets, technical areas (electrical, HVAC, server rooms), and common areas.
Architectural design emphasizes durability, modernity, and energy efficiency, using pre-engineered steel structures, insulated walls, and roofs.
[2] Landscape: Landscaping covers approximately 3,000 m², enhancing the building’s architectural value and creating green spaces. Includes trees, flower beds, decorative lighting, and drainage systems integrated with NSRP’s overall network.
[3] Administration Outdoor Shelter: approximately 700 m² area with a corrugated roof supported by steel structures. Designed to withstand local weather conditions and equipped with lighting and ventilation.
[4] Parking Area: Near the main entrance with 10 parking lots, each 5.5m x 2.5m. Includes fire safety signage, proper drainage, lighting, and fire extinguisher boxes.
[5] Roads: Concrete paving connects the building to existing roads, ensuring optimal operation and drainage.
[6] Master Key System: Includes Building Group Master Key, Building Master Key, and individual room keys for secure access.
[7] Piping:Includes firewater systems, potable water systems, sanitary wastewater systems, and stormwater drainage systems.
Fire water system integrated with NSRP’s existing fire water ring.
Drainage systems are designed for sanitary wastewater, clean stormwater, and building plumbing.
[8] Electrical Systems:
Power supply includes Transformers, distribution panels (including 6.6kV and 0.4 kV), distribution Boards and emergency backup systems. Lighting and small power systems use LED luminaries and IP-rated fixtures for indoor and outdoor areas. Earthing and lightning protection systems ensure safety and compliance with project specifications.
[9] HVAC Systems: Designed for continuous operation, maintaining building pressurization and appropriate working environments.
Includes fresh air treatment, round flow air conditioners, and centrifugal fans for exhaust.
Local control panels for system monitoring and integration with fire and gas detection systems.
[10] Telecommunication Systems: Integrated systems for PAGA, telephone, security (CCTV, access control), LAN. Redundant connections to existing NSRP infrastructure.
[11] Firefighting and Fire Alarm Systems:
Addressable fire alarm system with graphic display for quick fire detection and response.
FM200 fire suppression system for electrical, HVAC, and rack rooms.
Firefighting equipment includes indoor fire cabinets, outdoor hydrants, sprinkler systems, and portable fire extinguishers.
[11] Instrumentation: Includes transmitters (Level transmitters, Gas detector, Manual Call points, etc.), interfaces with NSRP’s existing Distributed Control System (DCS) and Fire and Gas System (FGS).
[12] Interior: Contractor is responsible for fixed interior and furniture procurement and installation, excluding movable furniture, which is NSRP’s responsibility. All other internal/external elements connected to the building are the contractor’s responsibility.
3. Scope of Services
The PMC Contractor shall, in accordance with international petroleum industry standards, building standard, practices and general construction permission, detailed engineering, procurement, construction, pre-commissioning, commissioning, performance test, start up, training, handover and project management principles, manage the whole project.
The PMC Contractor will mainly cover the management work for:
• Authority approvals for Construction plan (1/500), Construction permit, Firefighting approval, etc.
• Engineering Detail Design work for building architecture, civil, mechanical, power supply/ distribution, HVAC, Telecommunication system, Firefighting, Fire alarm and other facilities system for building work
• Procurement
• Construction
• Pre-commissioning & Commissioning
• Start up
• Performances test
• Training
• Approval dossier to be submitted to the relevant local Authorities
• As built documentation works
• Project handover works
The responsibility shall be to assist NSRP in establishing an efficient project supervising and consultancies, communicating, interfacing and coordinating all relevant parties, detail design reviews, change management, construction management, quality assurance and inspection, schedule and cost control, ensuring HSE policy applied for the whole project work, local authority and local society coordination, making sure the whole project meets the NSRP’s target and comply with Vietnam and international Law/regulation (Law No. 135/2025/QH15, Decree No. 06/2021/ND-CP, etc.)
4. General / key requirements for Contractor capability (questionnaires)
(1) Have you ever performed PMC service which involved the design, procurement, installation, pre-commissioning and commissioning for similar scopes (Building works include Civil & Structure, Piping/Plumbing, E&I) in Industrial Plant? Y/N
If yes, please provide the details and evidence (highlight/markup in Contract/ Addendum, etc.)
(2) Have you had experience of providing consultancy service to obtain permits from Government Authority: List of executed contracts for similar work (include obtaining Firefighting approval, Construction permit)? Y/N
If yes, please provide the details and evidence (highlight/markup in Contract/ Addendum, etc..)
(3) Does your company have Business License/Enterprise Registration Certificate which includes the work to be performed as set out in the Scope of Work? Y/N
If yes, please provide the details and evidence.
Không thể sao chép